This Project is related to the Italian nuclear decommissioning of the power plant site of Garigliano (ITALY) managed by Sogin, the Italian State-owned company responsible.
NOVOTECH, by subcontract of the GRIE.C.AM Company, has performed these main different activities:
a) Statistical analysis of historical wind data recorded by the wind measurement station;
b) Definition of FE Model of the very high chimney (~91 meters) of the Garigliano Power Plant, followed by Static and Dynamic analysis via MSC NASTRAN/PATRAN;
c) Wind Tunnel Test Campaign to measure and analyse the aerodynamic forces of two different system of demolition.
Finally, NOVOTECH has provided assistance with the monitoring of vibrations during the phase of demolition of the chimney.
Capabilities
ACOUSTIC AND VIBRATIONS
Experimental Modal Analysis
Real Life Monitoring
Active and Passive Vibration (Design and Testing)
Production of Noise and Vibrations Control System
Statistical Energy Analysis (SEA)
Noise Certification (FAR 36 and ICAO Annex 16)
Material Testing
AEROELASTICITY
GVT-Ground Vibration Testing
Aerolastic Certification with FAA, EASA
Gust Load Calculations
STRUCTURAL HEALTH MONITORING (SHM)
Vibration and Ultrasonic Based System with use of piezoelectric sensing and actuating patches
TEST RIG DESIGN
Preliminary Sizing
Design
Structural Analysis